After several years of engineering and design preparation, as well as four months of dedicated equipment installation, International-Matex Tank Terminals' (IMTT) Geismar Logistics Center went into full operation mode in 2008 with 30 storage tanks and six fully optimized Haver liquid-filling systems.

Read the full article here.