The 377,000-sq-ft facility will be located in Wrzesnia and will be operational
by the end of 2007. The new facility will increase the production capacity of
Wheelabrator’s existing Zagorow, Poland, manufacturing operation and will
employ a staff of 200 at its peak capacity.